Industriestrasse 66, Zug
Client V-ZUG Infra AG
General Planner / Architect
Soltic AG/ Diener Diener AG
Investment BKP23 Electrical
CHF 6.0 Mio
Realization
2011 – 2012
Space Program:
Production hall
Workshop
Kitchen
Staff and administration rooms
Electrical Engineering Services (Planning phases 31 – 53)
Planning of electrical systems, as well as technical site supervision and cost control of the electrical implementation
Pro Engineering AG plans the entire electrical systems
Backup, Safety, and Emergency Lighting
Switchgear Combinations
Lightning Protection and Grounding
Electrical rooms and riser zones
Power installations
Light Fixtures and Lamps
Low Voltage Systems
Multimedia, UHF
Security Systems
Evacuation System
Access Control / Door Management
Audio Systems